AMRUT – KERALA (Local Self Government Department, Govt of Kerala)
  • Last Update on : June 13, 2019
  • No.of Visitors :
  • Map Contact        

AMRUT – Completed Projects

Details of Completed Works  as on 7.6.2019 (CLICK HERE for Photos)

CITY WS SEW SWD UT PARKS Grand Total
TVM 12 37 45 1 1 96
KLM 0 6 2 1 1 10
ALP 1 0 36 3 1 41
KOC 0 2 13 1 1 17
TCR 2 0 35 1 2 40
GUV 0 0 10 0 0 10
PKD 0 0 8 2 5 15
KOZ 7 0 0 0 0 7
KNR 1 0 0 0 0 1
Grand Total 23 45 149 9 11 237

ULB PROJECTS – 169 Nos    

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 TVM SWD Construction of drain in Asan Nagar road in Muttathara Ward 0.098 3 10-11-2016 168m drain completed
2 TVM SWD Construction of drain in Aalukadu-Moonattumukku road in Manikyavilakom Ward 0.1581 3 05-11-2016 275m drain completed
3 TVM SWD Construction of drain in VKK Nagar road in Perunthanni Ward 0.2616 8 30-06-2017 447m drain completed
4 TVM SWD Construction of drain in Naalumukku-Chambakkada road in Sreekanteswaram Ward 0.1918 6 27-02-2017 350m drain completed
5 TVM SWD Construction of drain in Swathi Nagar Lane road in Fort Ward 0.2764 5 06-01-2017 500m drain completed
6 TVM SWD Construction of drain on Chattambi Swammi Nagar road in Perunthanni Ward 0.075 3 20-04-2018 107m drain completed
7 TVM SWD Construction of drain in Navodaya – Pazhanchira road in Ambalathara Ward 0.2377 10 30-06-2017 408m drain completed
8 TVM SWD Construction of drain on Aryankuzhi road in Kamaleswaram Ward 0.3794 5 17-05-2018 545m drain completed
9 TVM SWD Construction of drain on Kulapparakkonam road in Mannanthala Ward 0.4197 6 29-05-2018 600m drain completed
10 TVM SWD Construction of drain on Aruvikkarakkonam – Santhipuram road in Njandoorkonam Ward 0.4531 4 26-03-2018 647m drain completed
11 TVM SWD Construction of drain near Old National Highway road in Sreekaryam Ward 0.4074 4 19-04-2018 580m drain completed
12 TVM SWD Construction of drain on Peoples Lane road in Jagathy Ward 0.5553 7 06-06-2018 793m drain completed
13 TVM SWD Storm water drainage system for P D Nagar (from Vidya Gardens) in Vallakadavu ward 0.0957 2 23-10-2018 173m drain completed
14 TVM SWD Construction of drain on Oruvakkonam – Kattayikkonam road in Kattaikonam Ward 0.5539 3 26-05-2018 790m drain completed
15 TVM SWD Storm water drainage system for Marappalam Gardens road in Muttada ward 0.3472 4 19-11-2018 700m drain completed
16 TVM SWD Construction of drain on Parayikkadavu Theruvila road in Mudavanmugal Ward 0.2115 6 11-08-2018 300m drain completed
17 TVM SWD Storm water drainage system for Thirumala Alapuram road in Thirumala ward 0.5593 4 02-11-2018 997m drain completed
18 TVM SWD Storm water drainage system for Priyadarshini Nagar in Vallakadavu ward 0.1364 2 12-09-2018 242m drain completed
19 TVM SWD Althara Temple Back side Road in Vazhuthacaud ward 0.079 3 30-10-2018 140m drain completed
20 TVM SWD Thamburan Nagar area Road in Vazhuthacaud ward 0.1069 4 06-10-2018 195m drain completed
21 TVM SWD Storm water drainage system for Bilal road in Vallakadavu ward 0.1195 2 26-10-2018 192m drain completed
22 TVM SWD Storm water drainage system for Valiyathura muttathara road in Vallakadavu ward 1.4209 4 08-11-2018 882m drain completed
23 TVM SWD Storm water drainage system for Golf link road in Kowdiar ward 0.2784 5 14-12-2018 497m drain completed
24 TVM SWD Storm water drainage system for Amman kovil kazhakootam market road in kazhakootam ward 0.2871 4 27-07-2018 400m drain completed
25 TVM SWD Storm water drainage system for Elangam Panayil road in Nedumcaud ward 0.0885 4 14-11-2018 153m drain completed
26 TVM SWD Storm water drainage system for Kesavadev road to Thrivikramangalam Thamalam Jn in Mudavanmugal ward 0.3442 5 03-01-2019 656m drain completed
27 TVM SWD Storm water drainage system for Chembaka Nagar area in Vazhuthacaud ward 0.3239 5 20-12-2018 577m drain completed
28 TVM SWD Construction of drain on Malamugal Kachani road in Kachani Ward 0.5241 7 03-10-2018 848m drain completed
29 TVM SWD Construction of drain on Vazhathottam Kayalkara road in Poomkulam Ward 1.2325 8 08-01-2019 1760m drain completed
30 TVM SWD Construction of drain on Melemcodu road in Mannanthala Ward 0.5419 4 20-06-2018 774m drain completed
31 TVM SWD Storm water drainage system for Jyothipuram railway bridge-Uijjaini Mahakali Amman Kovil road in Valiyasala ward 0.1905 3 30-11-2018 319m drain completed
32 TVM SWD Construction of drain on Thaliyal Thelungu Chetti Theruvu road in Karamana Ward 0.4845 7 07-01-2019 619m drain completed
33 TVM SWD Storm water drainage system for Govt UPS to Sewage Farm in Beemapally ward 0.2884 4 29-12-2018 508m drain completed
34 TVM SWD Construction of drain on Vattavilakam -Keraladithyapuram road in Chellamangalam Ward 0.5115 12 02-02-2019 730m drain completed
35 TVM SWD AMRUT – Storm water drainage system for Chitra Nagar road in Poojappura ward 0.1537 3 16-10-2018 270m drain completed
36 TVM SWD Storm water drainage system for Kunnukuzhy-Kannamoola road in Kunnukuzhy ward 1.1676 7 22-02-2019 1900m drain completed
37 TVM SWD Storm water drainage system for Thanivilakam Lane Nemom in Ponnumangalam ward 0.0965 6 28-01-2019 170m drain completed
38 TVM SWD Construction of drain on Cheenikkonam Maruvathoor road in Nettayam Ward 0.213 12 01-02-2019 305m drain completed
39 TVM SWD Storm water drainage system for Shastri Nagar road / Mythodu Kuzhy (Right) in Mudavanmugal ward 0.5962 2 08-10-2018 1180m drain completed
40 TVM SWD Storm water drainage system for Kurattoor road in Mudavanmugal ward 0.041 5 14-01-2019 67m drain completed
41 TVM SWD Construction of drain on Ganga Nagar – Thrimoorthy Nagar road – KBS Line in Kamaleswaram Ward 0.6033 10 31-12-2018 860m drain completed
42 TVM SWD Construction of drain on Thottam road in Ambalathara Ward 0.2884 12 18-02-2019 412m drain completed
43 TVM SWD AMRUT – Storm water drainage system for MLA Road near Thrivikramangalam -Thamalam in Mudavanmugal ward 1.2292 3 08-12-2018 2300m drain completed
44 TVM SWD 2018/11994 : AMRUT – Storm water drainage system for Thirumala-Mangad road in Thirumala ward 0.3996 4 27-02-2019 714m drain completed
45 TVM SWD Construction of drain on Mithra Nagar road in Ambalathara Ward 0.3846 6 16-11-2018 549m drain completed
46 TVM UT Construction of foot path from Vazhuthacaud forest office jn to DPI along the left side of road Vazhuthacaud ward 0.09 3 18-09-2017 500m length Interlocking tiles laid
47 TVM PARKS Construction and beautification of Thechanvila Park in Punnakkamugal ward 0.3 6 26-05-2017 Renovation of the pond including hand rails, Walk way, seating facilities etc was provided
48 KLM SWD Uliakovil-Ashtamudi Drain-Phase I 0.41 2 28-01-2017 100%-Drainage system improved
49 KLM SWD Uliakovil Area Phase3 0.14 8 23-12-2018 100%-Drainage system improved
50 KLM UT Footpath from AR Camp to Railway Station Road-Phase I 0.33 12 15-11-2017 100%-Drainage system and the pedestrian traffic improved
51 KLM PARKS Improvement of Parks-phase 1(TK Divakaran Park , Nehru Park) 0.272 5 28-01-2017 100%-Park status improved
52 ALP SWD Thazhathparamb temple thodu at Palace Ward 24 6months 10-05-2018 mitigation of water logging
53 ALP SWD Koikkaramparambu thodu at Palace Ward 0.13 6months 31-05-2018 mitigation of water logging
54 ALP SWD Drain Joining Kottaram thodu-Vadasserry at Palace Ward 0.4 6months 28-09-2018 mitigation of water logging
55 ALP SWD SNDP Thodu at Palace Ward 0.41 6months 03-12-2018 mitigation of water logging
56 ALP SWD Valappil thodu at Zilla Court Ward 0.08 6months 03-11-2018 mitigation of water logging
57 ALP SWD Kaniyaparambu Thodu at Thathampally Ward 0.28 6months 28-09-2018 mitigation of water logging
58 ALP SWD karukapparambu 0.08 6months 31-05-2018 mitigation of water logging
59 ALP SWD kadarveli thodu 0.24 6months 29-08-2018 mitigation of water logging
60 ALP SWD kottamkulangara reach i 0.38 6months 19-12-2018 mitigation of water logging
61 ALP SWD kottamkulangara reach iii 0.43 6months 11-12-2018 mitigation of water logging
62 ALP SWD Kalappura – Reach 01 0.09 6months 25-11-2018 mitigation of water logging
63 ALP SWD Kalappura – Reach 02 0.33 6months 10-10-2018 mitigation of water logging
64 ALP SWD Kalappura – Reach 03 0.46 6months 23-11-2018 mitigation of water logging
65 ALP SWD Drain near Karuveli Puthenpurackal road culvert in Thondankulangara ward. 0.12 6months 14-09-2018 mitigation of water logging
66 ALP SWD Drain Near Vanakkumasa Church 0.18 6months 25-11-2018 mitigation of water logging
67 ALP SWD Near Indira Jn West road culvert 0.12 6months 14-09-2018 mitigation of water logging
68 ALP SWD Various drains in Mullathvalapp Ward 0.43 6months 22-01-2019 mitigation of water logging
69 ALP SWD Ayyamparambu thodu 0.4 6months 31-01-2019 mitigation of water logging
70 ALP SWD drain near cd pappachan 0.05 6months 25-01-2019 mitigation of water logging
71 ALP SWD Devi nagar 0.07 6months 13-02-2019 mitigation of water logging
72 ALP SWD Matsyagandhi 0.24 6months 26-02-2019 mitigation of water logging
73 ALP SWD Kottamkulangara Reach 4 0.23 6months 23-02-2019 mitigation of water logging
74 ALP SWD Chanda thodu to SN Kalasamithi 0.36 6months 06-02-2019 mitigation of water logging
75 ALP SWD Drain back of Smashanam to Illickal Road 0.23 6months 06-02-2019 mitigation of water logging
76 ALP SWD Old NSS Karayogam thodu 0.05 6months 12.03.2019 mitigation of water logging
77 ALP UT Pedestrian Network at Indira Jn 0.19 6months 10-12-2018 Improved Pedestrian safety
78 ALP UT pedestrian Network at jain temple road 0.06 6months 06-02-2019 Improved Pedestrian safety
79 ALP PARKS General hospital park 0.07 6months 19-11-2018 Green space development
80 ALP SWD Iravukadu – Kochu Rani Drain 0.26 6months 22-07-2019 mitigation of water logging
81 ALP SWD DRAIN FROM BYEPASS TO VATTAYAL ROAD 0.36 6months 14-06-2019 mitigation of water logging
82 ALP SWD Near Malgar Bridge 0.16 6months 19-04-2019 mitigation of water logging
83 ALP SWD Drain joining Rani Canal 0.043 6months 24-07-2019 mitigation of water logging
84 ALP SWD Drain Joining Ayyappan Pozhi near community hall at Railway Station Ward 0.21 6months 09.04.19 mitigation of water logging
85 ALP SWD Malikakkalchira 0.08 6months 09.04.19 mitigation of water logging
86 ALP SWD DRAIN FROM ARYAMPARAMBU CULVERT TO ST. JOSEPH KURISHADY 0.45 6months 03.04.2019 mitigation of water logging
87 ALP SWD DRAIN FROM REFORMING VAYANASHALA TO ST. JOSEPH KURISHADY 0.41 6months 21-01-2019 mitigation of water logging
88 ALP SWD POONTHOPPU ROAD TO AS CANAL ROAD 0.35 6months 02.04.2019 mitigation of water logging
89 ALP SWD Vayalar Area 0.22 6months 13-06-2019 mitigation of water logging
90 ALP SWD Drain near Vallamparambil 0.06 6months 18-06-2019 mitigation of water logging
91 ALP UT Pedestrian Network at Thumpoly Church 0.12 6months 3.04.2019 Improved Pedestrian safety
92 KOC SWD Renovation of Palarivattam Thammanam Thodu 1.24 1 year 13-07-2019 100%
93 KOC SWD Drain repair along Chennankulangara road at Edappally 0.26 6 months 19-03-2019 100%
94 KOC SWD Renovation of drains along Kannanthodathu road, Tricovil road 0.219 3months 04-09-2018 100%
95 KOC SWD Drain from Chilavannur road to Chilavannur river 0.385 5 months 26-11-2018 100%
96 KOC SWD New drain along Kochakko road Athiparambu road and Masjid road -div- 45 0.551 5 months 13-11-2018 100%
97 KOC SWD Construction of drain along Kaloor -Kathrikadavu road (old) 0.73 6 months 05-12-2019 100%
98 KOC SWD Drain near Thrithwam 0.387 4 months 05-12-2018 100%
99 KOC SWD Drain from Lisie jn. To Kottekanal 0.475 5 months 04-11-2018 100%
100 KOC SWD Drain from North over Bridge to Lissie 0.639 6 months 02-02-2019 100%
101 KOC SWD Kizhavana road east drain 0.09 6 months 29-01-2019 100%
102 KOC SWD Construction of drain along St. Vincent road 0.61 6 months 15-02-2019 100%
103 KOC SWD Cover Slab above Parayapilly Thodu Near Amrutha Hospital -Kunnampuram 0.387 6 months 26.03.2019 100%
104 KOC SWD Joys thodu, boundary thodu & athirthy thodu 0.428 6 months 31.03.2019 100%
105 KOC PARKS Renovation of St. John Park 0.36 8 months 21-01-2018 100%
106 KOC UT Construction of Foot Path from Jose junction to Atlantis at MG Road 1.73 9 months 06-04-2018 100%
107 TCR SWD STORM WATER DRAINAGE-PHASE-1- WORK-2-Netaji Rd- Mother land Rd 0.71 5 30-09-2018 100%
108 TCR SWD STORM WATER DRAINAGE-PHASE-1-WORK-3-Shanthi Rd 0.49 4 30-09-2018 100%
109 TCR SWD STORM WATER DRAINAGE-PHASE-1-WORK-12-South Pentark-Elite hospital 0.55 4 30-09-2018 100%
110 TCR SWD STORM WATER DRAINAGE-PHASE-2-work-46 pc thomas rd 0.67 5 30-09-2018 100%
111 TCR SWD STORM WATER DRAINAGE-PHASE-3-ND BRIDGE -JAVAHAR WORK 72 0.3 4 30-09-2018 100%
112 TCR SWD STORM WATER DRAINAGE-PHASE-3-Div 50 WORK 77 0.1 3 30-09-2018 100%
113 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 1(Div 28. C V Kochunni road)work 1 0.3 4 30-09-2018 100%
114 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 25,NEHRU NAGAR CHURCH-THIRUTHUR TEMPLE ROAD ) Work 73 0.68 5 20-10-2018 100%
115 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1(Div 28. PUTHANAGADI ROAD) WORK4 0.24 3 30-11-2018 100%
116 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1 (Div 20. Shastri Lane Part 1,Div 20. Shastri Lane Part 2)Work 7 0.42 4 10-11-2018 100%
117 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION PHASE 1 (Div 34. METROPOLITAN HOSP-BALIYA THODU, Div 34. METROPOLITAN HOSP-BALIYA THODU)WORK 11 0.47 4 15-11-2018 100%
118 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL ORPORATION Phase 1 (Div 34. POST OFFICE – BALIYA THODU) Work 13 0.44 4 20-11-2018 100%
119 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION(DIV 1, )Ramnagar Rd-1,2,3,4Work 27 0.68 5 20-11-2018 100%
120 TCR SWD AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION-PHASE 2 (Div 1 JAYAPRAKASH ROAD) Work 32 0.16 3 20-11-2018 100%
121 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Unity Road Part 1 & 2 )Work 48 0.24 3 20-11-2018 100%
122 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 52,west fort achuthamenon rd-2 )Work 86 0.54 4 07-09-2018 100%
123 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 1,Jayaprakash Lane)Work 33 0.071 3 07-09-2018 100%
124 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1(Div 34. Shakthan nagar) WORK 15 0.96 5 28-01-2019 100%
125 TCR SWD AMRUT SWD AND URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 51,THOPPILMOOLA-KALVARI )Work 75 0.44 4 30-11-2018 100%
126 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1( DIV 34. Thankamani Bus Stop)WORK 16 0.28 4 10-12-2018 100%
127 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 4,Viyyur Pandikkavu-Peringavu Canal )Work 40 0.29 4 22-12-2018 100%
128 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 9,Kuttumukku Road )Work 42 0.14 3 28-02-2019 100%
129 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1 (Div 34. POST OFFICE , LIC JUNCTION ) WORK 14 0.67 5 20-11-2018 100%
130 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Pallikkulam Road )Work 47 0.1 3 10-01-2019 100%
131 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 36,A R menon Road )Work 82 0.3 4 10-01-2019 100%
132 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 1(Div 33 PATTALA KINAR ROAD)work 10 0.59 4 08-02-2019 100%
133 TCR SWD AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 01, SEETHARAMASWAMY TEMPLE ROAD, DRAIN (Work 28 ) 0.71 5 08-02-2019 100%
134 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 7,MANNUMUKODU VIMALA COLLEGE-CHERUTTA) Work 69 0.43 4 08-02-2019 100%
135 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 9,KUTTUMUKKU RD )Work 70 0.4 4 31-12-2018 100%
136 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 20, Jesus Lane Road ,Alukka Angadi Road ,Nazerth Angadi Road )Work 44 0.97 5 15-02-2019 100%
137 TCR SWD AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div UDAYANAGAR NO9 DRAIN (Work 31 – PHASE 2 ) 0.21 3 11-03-2019 100%
138 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Thottathil Lane )Work 50 0.065 3 30-08-2018 100%
139 TCR UT AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 23- Unity road 1 and Unity road 2)Work 59 0.085 3 15-09-2018 100%
140 TCR PARKS Amrut-2017-18-Rejuvenation of Nehru park in Thrissur Corporation Phase I 0.91 5 30-11-2018 100%
141 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION-Phase 1 -( Div 28. Ancheri – Perivankulangara road – 1,2,3 + Netaji road – Motherland road – 2,3 + Kundolipadam road)Work 5 0.97 5 05-11-2018 100
142 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Thottanpetta Road )Work 52 0.04 3 30-03-2019 100
143 TCR PARKS AMRUT PROJECT FOR THRISSUR MUNICIPAL CORPORATION–Rennovation of Nehru park Phase II 0.69 4 30-03-2019 100
144 TCR SWD AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1 (Div 33. PATTALA KINAR ROAD,ST. JOSEPH MODEL SCHOOL)WORK 8 0.8 5 04-02-2019 100
145 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 A 0.15 6 15-03-2019 Coverage of drains increased. 3 water logging points eliminated
146 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 E 0.12 6 24-12-2018 Coverage of drains increased. 2 water logging points eliminated
147 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 F 0.1 6 0.3.12.2018 Coverage of drains increased. 3 water logging points eliminated
148 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 B 0.15 6 22.12.2018 Coverage of drains increased. 3 water logging points eliminated
149 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 C 0.142 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
150 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 D 0.145 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
151 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 E 0.053 6 22.02.2019 2 Water logging points eliminated
152 GUV SWD SAAP 2016-17 Package II – Covering and repair of minor drains in 16 different locations of the municipal area- Phase II 0.14 6 21-03-2019 4 Water logging points eliminated
153 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – ID 0.11 6 29-03-2019 3 Water logging points eliminated
154 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – IC 0.11 6 05-05-2019 3 Water logging points eliminated
155 PKD SWD Mission school SWD 0.168512 6 months 1/30/2019 Waterlogging issue solved
156 PKD SWD Puthupalli theru- Slaughter House-Mythri Nagar SWD 0.4119945 6 months 1/30/2019 Waterlogging issue solved, SWD connections made
157 PKD SWD Around District hospital SWD 0.4194452 6 months 03-08-2019 Waterlogging issue solved
158 PKD SWD Yakkara- Murikkav- AKG Nagar SWD 0.2577061 6 months 12/27/2018 Drain rejuvenation
159 PKD SWD Municipal Bus stand to Vettilakulam 0.3735047 6 months 01-09-2019 Waterlogging issue solved
160 PKD PARKS Easwar garden park 0.32 6 months 30-05-2018 Plot developed as park, elders and kids are using the park
161 PKD PARKS Remadevi park 0.34 6 months 14-11-2017 Plot developed as park, elders and kids are using the park
162 PKD PARKS Municipal traffic park 0.26 6 months 9/28/2018 Revamping of park, mainly used by Kids, beautifies the location
163 PKD SWD Head Post office to Ramanadhapuram SWD 0.45 6 months 03-02-2019 Drain rejuvenation
164 PKD SWD Poolakad drain 0.1698746 6 months 3/30/2019 Drain rejuvenation
165 PKD SWD Kalvakulam first reach SWD 0.4876683 6 months 03-12-2019 Drain rejuvenation
166 PKD PARKS Rose garden park 0.2345269 6 months 3/30/2019 Plot developed as park
167 PKD PARKS Kassim colony park 0.1304463 6 months 3/30/2019 Plot developed as park
168 PKD UT Footpath near fort area 0.51 6 months 1/30/2019 Useful for pedestrians
169 PKD UT Footpath on English church road to BEM School Jn 0.3440182 6 months   Useful for pedestrians and morning walk

KWA PROJECTS – 68 Nos.

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 TVM WS Replacing existing 100 mm AC along Mosque lane Pettah ward 0.24 3 14-09-2018 100%
2 TVM WS Replacing existing 80 mm AC along Ambalamukku Mannadi Lane 0.2 6 01-12-2018 100%
3 TVM WS Replacing existing 110 mm PVC along Thilak Nagar Parottukonam 0.23 6 12-02-2019 100%
4 TVM WS Replacing existing 50 mm GI along Musaliar lane Pettah ward 0.07 6 28-11-2018 100%
5 TVM WS Improvement of water supply to Kallampally & Periyamadam area by interconnecting with 110 mm PVC pipe 0.09 6 24-01-2019 100%
6 TVM WS Replacing old AC pipes with 110mm PVC pipes along Gandhi Nagar lane, Tagore Nagar, in Vazhuthacaud Ward, Thiruvananthapuram 0.13 6 28-04-2019 100%
7 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Sreevaraham area 0.5 6 11-03-2019 100%
8 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Ariyankuzhy area 0.7 6 13-03-2019 100%
9 TVM WS Replacing existing damaged pipe and laying 160 mm pvc and altering existing connection to new line at Puthenkada Jn to Magattukadavu under Thirumala section 0.5 6 10-01-2019 100%
10 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu CSI Jn to Annoor under Thirumala section 0.48 6 12-01-2019 100%
11 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu to Swathy Nagar under Thirumala section 0.11 4 21-12-2018 100%
12 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Thirumala to Puthenkada Jn under Thirumala section 0.0261 5 21-12-2018 100%
13 TVM Sewerage Rehabilitation of existing pump and machineries – Supply of Pump set for Kannammoola Pump House 0.345 6 20-08-2018 100%
14 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra nagar via vettamukku1. 0.5 4 31-05-2018 100%
15 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithranagar via vettamukku2. 0.35 4 31-05-2018 100%
16 TVM Sewerage TSS E Block Zone II Laying 300mm dia SW Pipe sewer main from Jagathy Vettamukku sewer main MH 60 towards Koottamvila Ex.MH (N-N1) 0.19 2 10-04-2018 100%
17 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road ( PRA – lane10) at Maruthankuzhy 0.143 6 12-09-2018 100%
18 TVM Sewerage Supplying and laying 200 mm dia SW sewer line from the Existing MH towards Binoy lane at Kizhakke Pattom Residence Association 0.072 4 31-03-2019 100%
19 TVM Sewerage TSS-Supplying and laying 200 mm dia SW pipe sewer line from Padayani Road Ex: MH towards Padayani Gardens Lane No. 8A (PRA G1 to G17) 0.118 6 12-09-2018 100%
20 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara line towards Padayani road association lane No. 05 ( PRA 16-20) at Maruthankuzhy 0.095 6 12-09-2018 100%
21 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara sewer main towards Dwani Lane ( PRA Lane No.07) at Maruthankuzhy 0.144 6 05-08-2018 100%
22 TVM Sewerage TSS – E Block Zone II – Laying 300mm dia SW Sewer main interconnection between Kootanvila and Chittatinkara Sewer main 0.066 2 14-05-2018 100%
23 TVM Sewerage TSS – Laying 250 mm dia DI K9 pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction 1.994 10 26-03-2019 100%
24 TVM Sewerage AMRUTH – TSS Rehabilitation -Increasing the capacity of sewer 150mm dia SW pipe to 200mm dia SW pipe and construction of RCC manholes at Manacadu Harshan Nagar and Seethapuram lane 0.13 5 31-12-2018 100%
25 TVM Sewerage AMRUTH – TSS Rehabilitation – Providing 200mm sewer line from VRA B – 26 to VRA A -22 and connectig to the existing MH near Khadi Board, Vanchiyoor 0.045 7 25-10-2018 100%
26 TVM Sewerage AMRUTH – TSS Rehabilitation -D Block – Supplying and laying 200 mm dia SW sewer branch line from The Existing MH towards Chalakuzhy – Kappil road 0.17 6 27-09-2018 100%
27 TVM Sewerage Laying 150mm SW pipe at Aiswarya lane, Poornima lane, Bharath lane, Mythri lane & Kavuvila lane at Sasthamangalam ward under sewerage section Sasthamangalam 0.29 5 20-10-2018 100%
28 TVM Sewerage AMRUTH -TSS Rehabilitation – Increasing in size of existing sewer main using 300mm dia SWpipe from Edappazhinji towards CSM Nagar III Reach Ch.817M to 1191m 0.375 8 12-01-2019 100%
29 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Jawahar Nagar area under Sewerage Section Sasthamangalam 0.066 5 31-03-2019 100%
30 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Kanaka Nagar area under Sewerage Section Sasthamangalam 0.063 5 16-08-2018 100%
31 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Nanthancodu Nalanda area under Sewerage Section Sasthamangalam 0.064 2 22-05-2018 100%
32 TVM Sewerage AMRUTH -TSS Rehabilitation — Dismantling of damaged brick manhole and re-constructing with RCC manhole at Peroorkada – Ambalamukku area under Sewerage Section Sasthamangalam 0.064 1 17-05-2018 100%
33 TVM Sewerage Urgent rehabilitation works on the sewerage system at Cherukode lane, Kunchalummoodu 0.078 4 30-03-2019 100%
34 TVM Sewerage AMRUTH -TSS Rehabilitation – Urgent rebalitation of dilapidated manholes at Karamana Mangad lane (KMRA) 0.04 6 13-05-2019 100%
35 TVM Sewerage AMRUTH – TSS- Rehabilitation- Urgent reconstruction of dilapidated old brick manholes at Nandavanam Gardens, Valiyasala 0.017 6 13-05-2019 100%
36 TVM Sewerage Supplying and laying 350mm DI K9 pumping main (karimanal pumping station to stilling chamber at bypass junction) 0.7 6 12-01-2019 100%
37 TVM Sewerage (A) 350mm DI K9 PM from well at Kulathoor to stilling chamber at Arasumoodu 1.03 6 27-03-2019 100%
38 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kuravankonam ,Vikramapuram Hills c- under Sewerage Section,Sasthamangalam 0.065 6 21-10-2018 100%
39 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-46 to 53- under Sewerage Section,Sasthamangalam 0.085 3 31-03-2019 100%
40 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-56 to 72- under Sewerage Section,Sasthamangalam 0.124 6 21-10-2018 100%
41 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line C-15 and C-16- under Sewerage Section,Sasthamangalam 0.154 6 31-03-2019 100%
42 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Nethaji Bose road , Marappalam near Keni bridge from NBRA H-1 to NBRA H-10 under Sewerage Section,Sasthamangalam 0.065 6 30-03-2019 100%
43 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Right R C area – under Sewerage Section,Sasthamangalam 0.1276 6 30-10-2018 100%
44 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Central R C area – under Sewerage Section,Sasthamangalam 0.1269 6 30-10-2018 100%
45 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in West R C area – under Sewerage Section,Sasthamangalam 0.1023 4 12-09-2018 100%
46 TVM Sewerage AMRUT SAAP 2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in West R C area under Sewerage section , Sasthamangalam 0.087 8 10-12-2018 100%
47 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 1 0.2 6 24-03-2019 100%
48 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 2 0.2 6 27-03-2019 100%
49 TVM Sewerage TSS-Rehabilitation and upgradation of existing sewer network at Thycadu MG Radhakrishnan Jn towards Poundkulam 0.25 4 25-09-2018 100%
50 KLM WS Improvement of existing WS System-Replacement of contaminated AC pipe lines in Kollam Corporation. 1 21 30-09-2018 100% Existing distri.system improved
51 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation (Laying 110mm PVC 2500m, 90mm PVC 4500m). 0.46 14 11-03-2017 100% Existing distri.system improved
52 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation – Replacement of damaged pumpset. 0.76 4 16-03-2017 100% Existing distri.system improved
53 KLM WS Improvement of existing WS System-Replacement of 50HP/75HP VT pumpsets at booster pumphouse at Ananathavalleeswaram. 0.55 6 01-03-2017 100% Existing distri.system improved
54 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to Tubewell pumphouses in Kollam corporation. 0.141 12 30-11-2017 100% Existing distri.system improved
55 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to booster pumphouse at Ananathavalleeswaram with 100Kg Chlorine cylinder. 0.086 15 30-07-2017 100% Existing distri.system improved
56 ALP WS Digital Survey and soil testing 0.5 6 months 08.03.2018 Digital survey completed
57 KOC WS Replacement of 250mm CI pipe by 300mm DI K9 pipe along Konthuruthi road of Kochi Corporation 2016-17 0.82 8 15.03.2019 100%
58 KOC WS Laying of 450mm DI (K9) pipe from north end of Aroor Edakochi bridge to KWA water tank site at Edakochi. 1.52 6 25.03.2019 100%
59 TCR WS AMRUT-Supplying and fixing bulk flowmeters in the transmission mains under Thrissur Corporation area 1 10 27-06-2018 8 bulk meters installed (100%)
60 TCR WS AMRUT- Supplying laying ,testing, commissioning and maintaining of 700 mm DI K9 raw water gravity main from Dam to aerator of 36 mld WTP at Peechi. 1 10 28-09-2017 370 Meter 700mm pipe supplied and layed(100%)
61 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package III 1.025 9months 25.06.2018 50 connections
62 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VII 0.539 6 months 12.10.2018 100 connections
63 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package I 1.5 6months    
64 KOZ WS Rehabilitation of existing old pipes, valvesand interconnections with the existing lines – phase 2- packageII 4.1 6 months    
65 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VI 0.8 6 months 27.12.18 99 connections
66 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package VI 0.849 9months 15.2.2019 NRW reduction
67 KOZ WS Rehabilitation of existing old pipes, valves and interconnections with existing lines – Phase-2- package V 2.8 6 months 19.2.2019 NRW reduction
68 KNR WS Supplying & Laying new distribution line at Pallikunnu & Puzhathi area providing house connection & inter connection with existing line 3.2 11 28-02-2018