Sl No SAAP Year Name of Project Sector Project Cost as in SAAP If AS is awarded, mention date of SHPSC Project Cost as per AS AS No TS No TS amount Tender Floated (Y/N) Tender Awarded (Y/N) AwardedCost
1 2015-16 Laying Gravity Main From JICA project at Mangattuparamba to pallikkunnu OHSR for pallikunnu and villages in Kannur taluk of Kannur Corporation Water Supply 23.5 23.02.2017 23.5 GO(Rt) No.534/2017/LSGD AMRUT/TEC/NR/5/2017 23.5 Y    
2 2015-16 Construction of 24LL Capacity OHSR at Pallikunnu for Pallikunnu & Puzhathi villages in Kannur Corporation Water Supply 6 23.02.2017      7.05 GO(Rt) No.534/2017/LSGD                                             AMRUT/TEC/NR/6/2017 4.05 Y    
3 2015-16 Construction of 14LL Capacity OHSR Thottada at Edakkad Zone 3 in Kannur Corporation Water Supply 15.08.2017 GO(Rt) No.2800/2017/LSGD CE/NR/17/2017-18  3 Y    
4 2015-16 Rehabilitation of existing old network, valves, house service connection and inter-connections with existing lines including road reformation charges (PWD/NH/Corporation) Water Supply 16.9 28.09.2017 16.9 GO(Rt) No.3170/2017/LSGD          
5 2016-17 Laying Conveyance main/Pumping main from Melechovva to OHSR at Edakkad including supply Erection of Pumpsets Water Supply 6.8 15.08.2017 6.8 GO(Rt) No.2800/2017/LSGD CE/NR/18/2017-18 6.5 Y    
6 2016-17 a) Enhancing Capacity of Treatment plant  from 30.00 MLD to 40.00 MLD including modernisation of existing treatment  plant  Water Supply 7.8 13.10.2017 7.8 GO(Rt) No.3530/2017/LSGD          
7 2016-17 Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges (PWD/NH/Corporation) Water Supply 15 28.09.2017 15 GO(Rt) No.3170/2017/LSGD CE/NR/19/2017-18  15.00 Y    
8 2017-18 Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges (PWD/NH/Corporation) Water Supply 20 14.12.2017 11.35 GO(Rt) No.4165/2017/LSGD          
9 2017-18 Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges (PWD/NH/Corporation) Water Supply 14.12.2017 8.6 GO(Rt) No.4165/2017/LSGD          
10 2017-18 Supplying & Laying new distribution line at Pallikunnu & Puzhathi area providing house connection & inter connection with existing line  Water Supply 18.27 14.12.2017 3.77 GO(Rt) No.3530/2017/LSGD          
11 2017-18 Laying new distribution line and providing new service connections at Elayavoor Zone Water Supply 14.12.2017 8 GO(Rt) No.4165/2017/LSGD          
12 2017-18 laying new distribution line and providing new service connections at Eldakkad Zone Water Supply 14.12.2017 5.7 GO(Rt) No.4165/2017/LSGD          
13 2015-16 Rejuvenation of SN Park Park 1.25 14.12.2017 1.1 GO(Rt) No.4165/2017/LSGD          
14 2016-17 Rejuvenation of Babu Rajendra park. Park 1 14.12.2017 0.59 GO(Rt) No.4165/2017/LSGD          
15 2016-17 Rejuvenation of Avera Gramamandiram park. Park 0.48 14.12.2017 0.41 GO(Rt) No.4165/2017/LSGD          
16 2017-18 Renovation of Kappad Sisumandiram park
 
Park 0.4 14.12.2017 0.41 GO(Rt) No.4165/2017/LSGD          
17 2017-18 Development of New Payyambalam park  Park 0.3 14.12.2017 0.45 GO(Rt) No.4165/2017/LSGD          
18 2017-18 Development of Anakulam park Park 0.3 14.12.2017 0.24 GO(Rt) No.4165/2017/LSGD          
19 2017-18 Development of Chelora park Park 0.87 14.12.2017 1.4 GO(Rt) No.4165/2017/LSGD          
20 2016-17 Construction of new footpath  with handrail and cycle track Urban Transport 7.41 14.12.2017 7.41 GO(Rt) No.4165/2017/LSGD          
21 2017-18 Multi Level Car parking complex at Stadium premises, Thallikaav & Bank road Urban Transport 9.34 14.12.2017 9.34 GO(Rt) No.4165/2017/LSGD          
22 2015-16 Construction/rejuvenation of drains. Storm Water Drainage 11.13 14.12.2017 11.13 GO(Rt) No.4165/2017/LSGD          
23 2016-17 Construction of  new primary drains, secondary drains and rejuvenation of primary drains Storm Water Drainage 12.6 14.12.2017 12.6 GO(Rt) No.4165/2017/LSGD          
24 2017-18 Construction and rejuvenation of  primary drains & secondary drains at
1. Thottadathodu and connecting drains
2. Varam, varam vayal, Katampallipuzha and connecting drains
3. Sea shore structures as per the requirement at Payyambalam, Thottadda, Ammayithodu  areas for eliminating sand deposits 
Storm Water Drainage 15.87 14.12.2017 15.87 GO(Rt) No.4165/2017/LSGD          
25 2016-17 Septage Treatment Plant at Chelora. Sewerage and septage 22.23 14.12.2017 3.42 GO(Rt) No.4165/2017/LSGD          
26 2017-18 Providing decentralised sewerage network with STP’s in old kannur municipal area. Sewerage and septage 28.00 29.12.2017 46.81 GO(Rt) No.5/2018/LSGD